X-Git-Url: http://git.i-scream.org/?a=blobdiff_plain;ds=inline;f=www%2Fcontents.inc;h=f7f6c6efa9583243ca9608c0c99c2bb35fe74fc8;hb=fbc1b6bfb18be984b7c8c3d4d65a6364cd0350ee;hp=d488642e94e289d815b80be85d7e6a4276b904d5;hpb=b4f8eaae6d0b52b8dba9fc8068b05785b05ed021;p=www.i-scream.org.git
diff --git a/www/contents.inc b/www/contents.inc
index d488642..f7f6c6e 100644
--- a/www/contents.inc
+++ b/www/contents.inc
@@ -2,7 +2,7 @@
@@ -13,28 +13,59 @@
Current Status
- Several central components are now functioning to initial
+ Most i-scream components are now functioning to initial
design parameters and data can now be passed through the
- system successfully. Many planning and design decisions
- are still being made, along with various specification
- documents. Detailed information can usually be found in
- the meeting minutes. Code is viewable via CVS to UKC
- users only.
+ system and displayed successfully. Documentation is still
+ being generated, to allow for future development of the
+ i-scream project. Detailed information can usually be
+ found in the meeting minutes. Code is viewable via CVS
+ to UKC users only.
+
+
+
+ The i-scream Distributed Central Monitoring System Reports
+ are now visible on the web. You may view all reports
+ available for each day, but please remember that this is
+ work in progress still, so the only data currently viewable
+ is our own data that has been harvested by our own testing.
+
+
+ Our current host development allows us to pass machine statistics
+ to our distributed filter arrangement, which then processes the
+ data and stores it for later use. An example of such use is the
+ historical report generator which produces graphs of machine
+ usage over periods of time (viewable in a web browser). Realtime
+ clients are also currently being developed - one Java Swing GUI
+ version and also a command line version that can run in a terminal
+ window. Alerting mechanisms are being put in place to complete the
+ i-scream system.
+
+
+
+ Builds of the i-scream Distributed Central Monitoring System
+ are now available for download from this
+ website. These are still very much in development, are should
+ only be used by people who have been in communication with the
+ development team.
- Presentations
+ Project Completion
- On Monday 16th and Tuesday 17th October all members of the group made presentations to various groups of peers.
+ The project deadline is 4pm on 29 March. As such, we plan to
+ complete the coding process by (at the latest) the end of the
+ project week (26/2 - 2/3). This allows time for documentation
+ to be tidied up and completed, and printing of the project.
+
+
+
+ As can be seen in the "problem domain" document, the project
+ was aimed at the UKC Computer Science department, and as such
+ we believe a demonstration to the "customer" is important. We
+ plan to do this over the next two weeks, and the feedback given
+ will allow any "last minute" alterations to be completed.
-
- For those who are interested you can view an online version
- of our presentation here.
-
- Alternatively you can download a powerpoint version from
- here.
-
Naming History